Proceedings of the International Plant Propagator's Society

Vol. 63

Title:
Upping Our Labor Game

Author:
Gail F. Berner

pp: 239

Abstract:
For the past 5 years, Spring Meadow Nursery has been actively seeking and implementing more efficient ways to work. We have made changes throughout our production departments, but most of what I am going to talk about today focuses on the propagation department which includes making and sticking cuttings and transplanting.

Figure 1 shows one person sticking cuttings in their own flat, a method that we used for 20 years (pre-lean flow). Following training in lean flow methods in 2009, we found that by changing to progressive or an assembly-line sticking method, we were able to increase productivity by 15% (Fig. 2). This method uses three people sticking flats. The first person removes the medium-filled flat from the upper conveyor and sticks approximately one-third of the cuttings. The second person sticks approximately one-third of the cuttings. The third person will finish sticking what is needed and place a plant label on the flat and move the finished flat to the lower conveyor. This method works very well when training new workers or trying to bring slower workers up to speed by placing the slower person in the middle so that they are pushed by the worker on their right and left sides.

Full text: IPPS members     ISHS members & pay-per-view
(PDF 5214131 bytes)

Translate:

           

IPPS membership administration       ISHS membership administration

IPPS—International Plant Propagator’s Society
4 Hawthorn Court . Carlisle, PA 17015-7930 . USA
Phone: 717-243-7685 . Fax: 717-243-7691 . Email: secretary@ipps.org