Search in IPPS abstracts:
Search

All Volumes

Previous article
Next article

Previous volume
Next volume

Proceedings of the International Plant Propagator's Society

Vol. 37

Title:
THERMABED—FAILURE THEN SUCCESS

Author:
Christopher Fairweather

pp: 317-320

Abstract:
With the increasing demand for rooted shrub cuttings and liners we decided in 1986 to double the heated space we had available for propagation.

Our first house was installed in 1979, and our first installation was a simple hot water system using alkathene pipe and a secondhand 120,000 B.T.U. boiler for which we paid only £10. This original system is still working well and we find it generally satisfactory. The main drawbacks are the considerable work involved with the installation. The other disadvantage we have noted over the years is the uneven temperature. There can be as much as five and sometimes 10 degrees drop, with the highest temperature near the boiler, dropping away at the farthest point.

Early in 1986 we prepared a new site and erected a 12m by 21m aluminum glasshouse. Our original hot water system had generally worked well for us and running costs had compared very favourably with other possibilities. Electricity on this scale would be easy to install but very expensive

Full text: IPPS members     ISHS members & pay-per-view
(PDF 161476 bytes)

Translate:

           

IPPS membership administration       ISHS membership administration

IPPS—International Plant Propagator’s Society
4 Hawthorn Court . Carlisle, PA 17015-7930 . USA
Phone: 717-243-7685 . Fax: 717-243-7691 . Email: secretary@ipps.org