Search in IPPS abstracts:
Search

All Volumes

Previous article
Next article

Previous volume
Next volume

Proceedings of the International Plant Propagator's Society

Vol. 31

Title:
MY EXPERIENCE WITH DOUBLE CLAD TUNNELS

Author:
Jonathan Van Der Borgh

pp: 397-398

Abstract:
We have always been concerned with waste in our business. We have tried to prevent waste of resources where possible, and have used waste products if available.

On our dairy farm, for example, we installed a Retriever unit in 1974. This is a water tank with a copper coil inside which uses the waste heat from the compressors for the refrigerated bulk milk tanks, and uses it to heat 60 gallons of water to 128°F from the ambient temperature of the day. We need water at 150°F to circulate and clean the milking pipelines, so we only have to buy the energy for the additional 22°F required. For an outlay of £740 in 1974, we are saving currently £1,250 a year in fuel costs.

Also on our dairy farm, we use old railway sleepers for silo walls, old motor car tyres to cover the silo sheets, wood shavings for cow bedding and we feed wet brewers grains to the cows as a part of their bulk winter ration.

In 1974 we started our container nursery on an acre of waste land, that is to say, land which was

Full text: IPPS members     ISHS members & pay-per-view
(PDF 234656 bytes)

Translate:

           

IPPS membership administration       ISHS membership administration

IPPS—International Plant Propagator’s Society
4 Hawthorn Court . Carlisle, PA 17015-7930 . USA
Phone: 717-243-7685 . Fax: 717-243-7691 . Email: secretary@ipps.org