|
Vol. 28
Title: OIL SAVINGS IN PITHOUSE ROOTING OF RHODODENDRON AND LAUREL CUTTINGS
Author: Adrian J. Knuttel
pp: 516
Abstract:
Five years ago, when the price of heating oil was only 17.9 cents per gal., fuel costs were not a major consideration in designing propagation facilities. Now that the cost of oil is almost 50 cents per gal., and is expected to go much higher, it seems appropriate to optimize designs for fuel economy. At our nursery, we have had good results with a pithouse. Ours is an H-shaped building constructed of cement blocks at a cost of approximately $9000. The legs of the H are 96 × 11 ft. and 16 ft. apart. The connector between the legs is 12 × 16 ft. The walls of the connector and the inner walls of the legs are 7½ ft. high, and the outer walls are 6 ft. high. Soil is backfilled to about 10 in. from the top of the walls. The rafters are 2 × 6 spruce 3 ft. on center. There are 3 layers of plastic on the roof. We have 0.004 clear plastic on the underside of the rafters, 0.006 "602" on top cleated with 2 × 3's, and another layer of 0.006 "602" over the 2 × 3's. The connector contains a propagation
Full text:
IPPS members
ISHS members & pay-per-view
(PDF 149683 bytes)
Translate:
IPPS membership administration
ISHS membership administration
|